5 min read

Inspectors are not trying to catch you out; they need to be satisfied that hidden work was built as described. That means photographs with context, not close-ups with no reference point.

Context before detail

Take a wide shot that identifies the plot and elevation, then move in for the detail. A close-up of insulation with no surroundings could have been taken anywhere.

Where possible include a fixed reference — a plot number board, a window opening, a corner — so the location is obvious.

Proof of when

A photo of an open trench is only useful if it is clear it was taken before the pour. Date and time on the image itself removes the argument.

Chronological order matters too: evidence presented in build sequence is far quicker to review than an unsorted folder.

Proof of where

On multi-plot developments, location data is what separates plot 7 from plot 12. Coordinates stamped on the photo, shown on a map, settle it instantly.

Notes that answer the obvious question

One line is usually enough: product used, thickness, depth achieved, or which junction is shown. Dictate it on site while you remember.

Present it as one record

Give the inspector a single link or report covering the stage, rather than photos dripping in by email. Fewer round trips means faster sign-off.

Record it properly, first time

TotalCertify stamps every site photo with its stage, location and time, then shares it with building control in one link.